Williams Kern River Pipeline Enhancement
ElBERTA Scope
LA1-018
March 6, 2001
Paul Hickey
Three (3) compressor stations will be added to the Kern River Pipeline in increase capacity by 130 MMSCFD. Target date for all three (3) stations to be on line is June 15, 2001. Solar is supplying all Turbomachinery and site work relating to Turbomachinery. Williams is handling utilities to site, pipeline tie-in’s, roadwork, permitting, fencing, etc. All stations will be operated manually 24/7 initially with SCADA hookup later.
1250 psig @ -20 / 150 ° F
Elevation 5000’
Solar Specs B31.8 Process Piping (B31.3 can be used on utilities)
Williams prefers API 5L, X-60 Grade on Large Bore Piping
Solar Symbols on P & ID’s (At least initially)
T/M Performance c/w Curves
Vent Silence Sizing
Time (30 or 60 seconds based on seals)
Volume of pipe valves skids and turbine piping
Delay blowdown of station header until unit blowdown and limit rate to same are as pipe/valve skid
75 dBA
1) Fixed Portion
1) Design
P & ID’s
Plot Plan
Foundation Location Plan
One-Line
Electrical Interconnecting Drawings (On Skid Controls)
PCR Layout (Vendor)
Hazardous Area Classification
Site Lighting
Cable Schedule
Cable Tray Routing
Piping Stress Calculations
Piping Isometrics
Pipe Supports (Free standing / steel) (Concrete Sleepers by Site Contractor)
Instrument Index and Data Sheets
Cause & Effect
No HAZOP
TurboFab Items
Loose Shipped Items (Will not ship to TF)
All Tagged Items
Valves > 2"
Vent Silencer
Inlet Scrubber
PCR
Unclassified (Unpressurized)
Battery & Chargers (T/M)
Station Control Panel (One Bay)
Gas Start / On Skid Controls / Wet Seals
Area For Future SCADA
Desk and Chair / No Bathroom
Insure Door is high enough for snow
Oversize for unknown
Condensate Tank (Atmospheric)
No Coolers
Startup and Commissioning Spares
Local
Site
FSR
Commissioning Specialist (BOP) (Need to schedule)
2 – Centaur 50 / C336
1 – Centuar 40 / C336
Ancillary Skid
Huff & Puff
Gas Start / Wet Seals
Turbine Enclosed only
On Skid Controls
Battery Chargers and Batteries
Station Panel
No
No
3 – 16" 600 RF x 16" 600 RF Pipe/Valve Skid
Bettis Robotarms
EVS Ball Valves and Wafer Checks
Anti-Surge Valve (Ball or Globe???)
PSV (Compressors can produce higher pressure)
Cable and Tray
Air Supply to Instrumentation
Dual Filter Separators
Dual regulators
Electric Heater (Panel in PCR)
Heat Tracing (Electric c/w local thermostat)
On skid controls in EP Electrical Boxes
Cable and Tray
Air Supply to Instrumentation
Interconnecting Piping (TurboFab or Shaw)
Tracibility per DOT required
TurboFab Furnished NDT
Offices
Sanitary Facilities
Water
Storage (Engineered Items)
Engineers Items
Turbomachinery
Special Tools
Expendables
Gaskets, studs
Tubing fittings
Electrical fittings
Expendables
Lube Oil (C32)
Flushing / Fill / Commissioning
Cable / Tray
Tubing Fitting
< 2" Valves
Structural Materials
Pipe Supports / Cable Tray Supports / Walkway
Miscellaneous pipe & fittings
All non spooled piping
Studs & Gasket (Need to determine amount)
Site Ballast
Oily Water Sump
Septic Tank
Site Lighting Fixtures
Foundations
Design / Excavations / Concrete Work
Landscaping
Site Ballast
Turbomachinery
Install / LO Flushing / Commissioning
Piping
Install Piping
Pipe Supports
Design Concrete Sleepers only
Build all steel and free standing supports to Solar Design
NDT (100% Xray on Process Piping)
Hydrotest
Air Compressors
Condenstate Tank
Sumps
Oily Water Sump
Septic Tank
Potable Water Tank
Solar Standard
Instrumentation
Electrical
Cable and Tray
Detailed Design
Installation
Pickup Land Power
Set PCR
Pre-Commissioning
Air / Electrically
Energize PCR / Site
Purge
First Gas
Blowdown
Pressure in Increments
Commissioning Equipment
Acceptance
Performance ????
PM David Richoux
PE Paul Hickey
ME Mark Jarzomski
IE Fabrizio Frau
EE Will Kummer
Buyer Elaine Massey / Marian Popp
QC Charlie Nix
Sales Tom Cleeland
TM PM Steve Rawson